Ship lifting operations

LLC “INIA” performs ship-lifting works, including sealing, soil removal, underwater tying, sealing with polymer materials, sealing of shaft lines, installation of plugs, electric arc welding, electro-oxygen cutting. LLC “INIA” uses its own modern water drainage (pumps, hydromonitors) and compressor equipment, ship-lifting pontoons and parachutes.

Lifting operation the sunken floating dock No. 154 with the “Volgoneft-263” tanker on the slipway deck.

Emergency rescue operations in NFС “Zakharii”.

Operation to lift the sunken barges P-3027 and P-3038.

Operation to lift the sunken ship DELFI, Odesa, 2020.
(sealing of the outer circuit, soil harvesting, an underwater strapping, hermetic sealing of the outer contour with polymeric materials, tightness of the shaft line, Installation of Installation of plugs).

For more details, please follow the links 1 and 2.

Lifting the sunken double-tube pontoon in the waters of the port of Chornomorsk, 2021.

Operation to lift a sunken ship, 2023.

Operation to lift a sunken ship, 2023.

For more details, please follow the links 123 and 4.